30Jun
Medupi Power Station
The building of the Medupi Power Station took over 650,000 cubic meters of concrete. Challenges that were met were delivering the high amount of concrete while managing the heat of hydration, and the use of 40% fly ash was used to help control temperatures.
- On June 30, 2023 Read More